Other stowage compartments
IntroductionWires with Cross Section up to 0.35 mm 2,
Repairing
Special tools and workshop equipment
required
Crimping Pliers - .35-2.5mm -VAS1978/1A-
Wiring Harness Repair - Crimping Head - .35-2.5mm
-VAS1978/1-1-
When repairing wires with a cross- ...
One-Part Wash Primer
Definition:
One-Part Wash Primer -LVM 044 007 A2-, light gray
One-Part Wash Primer -LVM 044 171 A2-, dark gray
Edition 08/2013
Product Description
The ...
Test Requirements
Note
The A/C system is functioning correctly when the air flowing
from the instrument panel vents has a temperature of 70C
or lower.
Setting on Climatronic “LO”.
Setting on A/C system ...