Volkswagen Polo Service & Repair Manual: Two-Part IR Premium Filling Paste
Two-Part IR Premium Filling Paste -LSP 787 220 A1- |
Two-Part IR Premium Filling Paste -LSP 787 220 A2- |
Two-Part IR Premium Filling Paste -LSP 787 220 A3- |
The Two-Part IR Premium Filling Paste -LSP 787 220 A1/A2/A3-
is a high-quality polyester filling paste used for vehicle
paintwork repairs. |
All conventional metallic base surfaces |
Also adheres very well to galvanized base surfaces. |
Non-porous and easily-shapeable. |
Well-suited for IR drying |
Well-sanded factory or old paint |
Hardened and sealed two-part filler/two-part primers |
Cleaned and sanded UP-GF surfaces, free of separating agents |
Caution
This filling paste may not be applied to PVB
(acid-hardening) adhesive primers or one-part primers
(for example, synthetic resin). |
Application on thermoplastic or elastic coatings is
also not possible. |
|
|
|
|
Pre-treatment of base surfaces: |
– |
Remove any grease and sand the surface. |
– |
Bare metallic base surfaces are to be insulated with
Two-Part Wash Primer -LHV 043 000 A2- and then filled with
Two-Part HS Performance Filler. Sand the filler after drying. |
– |
With UP-GF underbodies, clean components of any residual
agents and sand the surface. |
– |
Before reworking, apply a suitable cleaning agent to all
base surfaces to ensure a clean and residue-free surface. |
|
|
|
– |
Add 2 to 3 % by weight Two-Part Hardener -LVM 018 000 A1/A2-
or, especially when dealing with high temperatures, Two-Part
Hardener, Long -LVM 018 100 A2-. |
Note
Avoid using excessive hardener paste, to prevent it from
bleeding through, especially on daylight colors and light
metallic colors. |
– |
At +20 °C (68 °F) room temperature for approximately two to
four minutes. |
|
|
|
– |
At +20 °C (68 °F) room temperature for about 20 to 30
minutes. |
|
|
|
Short-wave heaters for three minutes (at 50 % power) |
Medium-wave heaters for five minutes. |
|
|
|
In connection with the aforementioned drying time: |
– |
Dry-sand the pre-sanding with P80-240 grit sandpaper |
– |
Dry-sand the final sanding with P240-400 grit sandpaper |
Note
Temperature resistance up to +80 °C (176 °F). |
|
|
|
Fine filling paste by itself. |
Rework fine filling paste with Two-Part Fine Filling Paste -LSP
784 002 A2- or with Two-Part Spray Filling Paste -ALN 788 007-
(except on galvanized steel). |
Prime sanded-through areas and filled areas again with
Two-Part Wash Primer -LHV 043 000 A2- and then fill with
Two-Part HS Performance Filler. |
– |
Then paint over with the top coat. |
Note
Before filling, dry-sand the entire surface with P280-400
sandpaper. |
|
|
|
Personal Protective Equipment: |
Note the safety data sheets |
Wear the personal protective equipment during application |
|
|
|
Delivery Viscosity |
pasty |
Flashpoint: |
Filling paste over 23 °C (73.4
°F) |
VOC value: 2004/42/IIB(b)(250)150 |
The EU limit for this product
(product category IIB.b) in ready-to-use form is a maximum of 250 g/L
volatile organic compounds. The VOC-value of this product in
ready-to-use form is a maximum of 150 g/L. |
The guaranteed shelf life is 12 months from the production
date. Use no later than the date indicated on the label and
store in original container at +20 °C (68 °F). |
|
|
|
– |
Storage Temperature +20 °C (68 °F) (temperature should not
exceed +30 °C (86 °F)). |
|
|
|
Definition:
Two-Part Spray Filling Paste -ALN 788 007-
Edition 06/2011
Product Description
...
Definition:
Two-Part Diamond Aluminum Filling Paste, Powder -DA 004 200
A2-
Two-Part Diamond Aluminum Filling Past ...
© 2016-2024 Copyright www.vwpolo.net